Strong Slabs Start Here

A slab is only as strong as the ground beneath it. Damon’s Earthworks offers professional slab preparation in Gympie, delivering safe, stable and level foundations for homes, sheds and concrete pads. Our services include site clearing, house and shed pad preparation, footings, drainage, pier holes, pool digs, demolition and the removal of builders’ rubbish.


With more than 25 years of civil construction and earthmoving experience, we know that precision and detail are critical to achieving a slab that lasts. Every site is prepared with the right equipment and methods to support a reliable build.


Start your project with a strong foundation. Call 0429 999 703 today to arrange slab preparation.

Frequently Asked Questions

  • What steps are involved in preparing a slab?

    Key steps include clearing the site, removing debris or vegetation, levelling and compacting the soil, creating footings, installing drainage and forming pier holes if required. For house or shed pads, a layer of crushed rock or sand may be added to improve stability. Each step is designed to prevent structural movement and provide a strong foundation for the slab.

  • Why is slab preparation important?

    Slab preparation is essential because it determines the strength and longevity of the finished structure. By compacting soil, adding footings and installing drainage, the slab is less likely to crack or sink over time. Poor preparation can lead to uneven floors, water damage or foundation issues. A properly prepared slab ensures the building above is safe and secure.

  • How long does slab preparation take?

    The timeframe depends on the site size, soil condition, and complexity of the project. Preparing a small shed pad may take one to two days, while house slabs or larger areas could take a week or more. Factors such as demolition, tree or stump removal and poor soil conditions can add extra time before concrete is poured.

Enquire Now

Divider Icon

From Clearing to Concrete Prep

Proper slab preparation goes far beyond levelling soil. It involves compacting the ground, ensuring drainage, and preparing footings to meet engineering requirements. By addressing these details from the start, the risk of movement, cracking, or water damage is significantly reduced.


We manage the entire process, from tree and stump removal to concrete preparation, ensuring your slab is stable and ready to support any structure. Whether it’s for a new home, shed or outdoor project, our team delivers reliable results backed by decades of practical know-how.


Talk to us about your upcoming build today and take the first step toward a solid, long-lasting slab.